Finishing touches still need to be done, but the Missouri River bridge between Fort Pierre and Pierre scheduled to fully open back up Monday; Shared use path opened today | DRGNews google-site-verification: google9919194f75dd62c5.html Source link Post navigation Two men from Winner sentenced to federal prison for their roles in a drive by shooting